研究文章
城市道路建设的成本和时间估计使用安和支持向量机
|
|
预计持续时间(天) |
体育的持续时间模型测试子集(%) |
|
安1 |
安2 |
安5 |
安6 |
支持向量机3 |
支持向量机4 |
|
| (1) |
12 |
−26.88 |
−27.47 |
−20.84 |
−17.89 |
−29.45 |
−69.18 |
| (2) |
26 |
49.00 |
14.41 |
14.84 |
37.66 |
6.31 |
−2.46 |
| (3) |
20. |
11.24 |
−4.21 |
7.70 |
24.81 |
−4.03 |
−7.53 |
| (4) |
35 |
−0.63 |
1.07 |
9.13 |
−45.02 |
11.06 |
28.42 |
| (5) |
34 |
19.86 |
22.68 |
13.73 |
29.95 |
35.81 |
36.24 |
| (6) |
17 |
34.71 |
26.11 |
−13.14 |
−12.66 |
−5.80 |
0.01 |
| (7) |
17 |
−39.19 |
−27.34 |
−21.32 |
35.01 |
31.42 |
27.06 |
| (8) |
20. |
−86.38 |
−38.59 |
−57.30 |
−93.00 |
−83.95 |
−41.62 |
| (9) |
25 |
3.90 |
−14.67 |
−3.53 |
−2.19 |
5.42 |
−0.93 |
| (10) |
35 |
−16.14 |
13.57 |
−0.55 |
6.17 |
−28.22 |
−1.72 |
| (11) |
25 |
−61.40 |
−62.19 |
−55.17 |
−54.97 |
−17.28 |
−23.71 |
| (12) |
38 |
0.66 |
−14.99 |
0.85 |
−1.74 |
21.63 |
19.26 |
| (13) |
41 |
−124.67 |
−123.00 |
−113.63 |
−103.76 |
−66.12 |
−63.11 |
| (14) |
60 |
−51.47 |
−53.54 |
−47.83 |
−56.72 |
−23.93 |
−24.82 |
| (15) |
60 |
42.08 |
43.97 |
37.67 |
44.03 |
17.42 |
13.95 |
| (16) |
60 |
−29.36 |
−24.88 |
−17.08 |
−30.75 |
−22.26 |
−19.72 |
| (17) |
75年 |
5.61 |
1.09 |
12.14 |
1.29 |
7.95 |
7.29 |
| 日军 |
35.48 |
30.22 |
26.26 |
35.16 |
24.59 |
22.77 |
|
|