表2.
乌干达坎帕拉建筑工程中PPE在乌干达的应用相关因素。
|
| 多变的 |
使用ppe? |
单一的逻辑回归分析 |
多变量逻辑回归分析 |
| 不 (的) |
是的 (的) |
UOR(95%CI) |
价值 |
AOR(95%CI) |
价值 |
|
| 性别 |
|
|
|
|
|
|
| Male |
270(88.5) |
35(11.5) |
1 |
|
1 |
|
| Female |
55(68.8) |
25(31.2) |
3.51(1.94-6.32) |
<0.001 |
6.64(1.55-28.46) |
0.011 |
| 年龄多年 |
|
|
|
|
|
|
| 18–30 |
250(80.2) |
40(13.8) |
1 |
|
1 |
|
| 31–45 |
65(81.3) |
15(18.8) |
1.44(0.75-2.77) |
0.272 |
1.62(0.55-4.73) |
0.379 |
| 46–60 |
10(66.7) |
5(33.3) |
3.13(1.02-9.62) |
0.047 |
5.89(0.67-51.65) |
0.109 |
| 就业形式 |
|
|
|
|
|
|
| Permanent worker |
24(16.5) |
15(38.5) |
1 |
|
1 |
|
| Temporary worker |
162(82.2) |
35(17.8) |
0.35(0.16-0.73) |
0.005 |
0.05(0.01-0.27) |
<0.001 |
| Casual worker |
139(93.3) |
10(6.7) |
0.12(0.05-0.29) |
<0.001 |
0.01(0.001-0.071) |
<0.001 |
| 过去的安全措施知识 |
|
|
|
|
|
|
| No |
305(95.3) |
15(4.7) |
1 |
|
1 |
|
| Yes |
20(30.8) |
45(69.2) |
45.80(21.8-95.8) |
<0.001 |
100.72(26.00-390.16) |
<0.001 |
| 每月安全培训 |
|
|
|
|
|
|
| 1-2 |
24(70.6) |
10(29.4) |
1 |
|
1 |
|
| 3 and over |
301(85.5) |
50(14.3) |
0.40(0.18-0.88) |
0.024 |
1.10(0.18-6.61) |
0.916 |
| 每月CPES. |
|
|
|
|
|
|
| 1-2 |
150(90.9) |
15(9.1) |
1 |
|
1 |
|
| 3 and over |
175(79.6) |
45(20.6) |
2.57(1.38-4.89) |
0.003 |
0.53(0.12-2.38) |
0.408 |
|
|
笔记。百分比计算为行百分比();AOR:调整的赔率比;UOR:不调整的赔率比;%是统计学意义的。多变量逻辑回归分析涉及所有变量%在不明显的分析;CPE:持续的专业教育。
|