|
| 约束 |
COM_1 |
COM_2 |
IOM_1 |
IOM_2 |
单位 |
|
| 电缆的力量 |
[0.18,0.40] |
[0.18,0.40] |
[0.18,0.40] |
[0.18,0.40] |
Fpk一个kN |
| 统一的电缆力 |
(100−100) |
(100−100) |
(100−100) |
(100−100) |
kN |
| 主梁的垂直位移 |
(−0.05,0.05) |
(−0.05,0.05) |
(−0.05,0.05) |
(−0.05,0.05) |
米 |
| 沿着大桥桥塔位移 |
(−0.03,0.03) |
(−0.02,0.02) |
(−0.03,0.03) |
(−0.02,0.02) |
米 |
| 南北主梁的相对位移 |
(−0.08,0.08) |
(−0.01,0.01) |
(−0.08,0.08) |
(−0.01,0.01) |
米 |
| 砝码 |
- - - - - - |
- - - - - - |
[0,500) |
[0,500) |
kN |
| 可以解决的 |
是的 |
没有 |
是的 |
是的 |
- - - - - - |
|
|