研究文章

发展决策支持模型选择一个维护计划使用模糊指标的方法:一个理论框架

表3

言语和语言方面的评价20.]。

语言变量 模糊尺度

S8:某些(C) (1.00,1.00,0.00,0.00)
S7:极有可能(EL) (0.98,0.99,0.05,0.01)
S6:最有可能(ML) (0.78,0.92,0.06,0.05)
S5:有意义的机会(MC) (0.63,0.80,0.05,0.06)
S4:它可能(IM) (0.41,0.58,0.09,0.07)
S3:小机会(SC) (0.22,0.36,0.05,0.06)
S2:非常低的机会(VLC) (0.10,0.18,0.06,0.05)
S1:极有可能(欧盟) (0.01,0.02,0.01,0.05)
S0:不可能的(我) (0.00,0.00,0.00,0.00)